HS Commercial Washers
High-Speed Extraction, Robust Design, and Proven Professional Reliability
Discover how Girbau upgraded the in-house laundry at The Landmark London hotel through the installation of a high-performance industrial washer in a highly complex architectural environment. Thanks to precise planning, a five-hour installation process, and efficient technology, the project improved productivity, sustainability, and operational continuity at one of London’s most iconic hotels.
To upgrade the on-premise laundry at The Landmark London by replacing an outdated 55 kg washer with a higher-capacity, high-performance model, while ensuring a smooth installation within a highly confined basement space and minimising operational downtime.
The hotel’s laundry is located in the basement, with extremely limited access and minimal manoeuvring space. In addition, the laundry operates 365 days a year, making it essential to complete the installation within a very short time window to avoid disruption to the daily operations of a five-star hotel.
Girbau installed a HS-6057 washer with a 63 kg capacity through a carefully planned and precisely executed operation. A delivery truck equipped with a HIAB crane was used to lower the machine through a basement window, after temporarily removing a section of the fire wall. The entire installation process, including utility connections and commissioning, was completed in just five hours over the weekend, ensuring minimal disruption to hotel operations.
Hotel overview
Located in the heart of London, adjacent to Marylebone railway station, The Landmark London is a prestigious five-star hotel offering over 300 guest rooms, a luxury spa and health club, gymnasium and a 15-metre swimming pool. The hotel is renowned for combining classic British elegance with world-class facilities and service standards.
While flatwork finishing is outsourced, the hotel’s on-premise laundry processes:
The new Girbau HS-6057 washer replaces a 55 kg machine that had reached the end of its service life, delivering increased capacity, improved efficiency and enhanced fabric care to support the hotel’s demanding laundry requirements.
Do you need to upgrade your laundry with a high-performance solution even in complex environments like The Landmark London?
High-Speed Extraction, Robust Design, and Proven Professional Reliability
The installation of the Girbau HS-6057 has significantly improved laundry performance at The Landmark London. The increased capacity and high-speed extraction reduce residual moisture, enabling shorter drying times and higher daily throughput. This has resulted in improved productivity and a more efficient laundry workflow while maintaining the hotel’s premium linen quality standards.
Operating in a laundry that runs continuously throughout the year, the HS-6057 has proven to be highly reliable. Girbau’s G-Drive technology ensures stable, well-balanced operation even at maximum spin speeds, resulting in quieter performance, reduced mechanical stress and long-term durability. This reliability is critical in a high-end hospitality environment where operational continuity is essential.
The HS-6057 contributes strongly to the hotel’s sustainability goals by reducing water and energy consumption. Improved water extraction lowers energy demand during drying, while the washer’s overall efficiency supports responsible resource management. Inclusion on the Water Technology List confirms compliance with the UK’s strict environmental efficiency standards and enables financial benefits through the Enhanced Capital Allowance scheme.
“We are very busy here and Girbau told us exactly how, when, and where it would be done. The installation team were very professional throughout, and we are very pleased.”
Director of Accommodation, The Landmark London